As Germany eliminates VAT exemptions (effective January 2025) and the U.S. imposes 12% tariffs on Southeast Asian modules, selecting a supplier who understands both policy and technology becomes more critical than bargaining power. As foreign trade solution experts serving multinational buyers, we offer these procurement strategies.
Technical Parameter Comparison: More Than Just Power Differences
Three Cost Pitfalls Most Often Overlooked by Buyers
1. Hidden Transportation Costs
Residential panels: A 40HQ container holds only 540 panels (standard size 1.1×2.2m).
Commercial panels: Requires special oversize transport permits (width exceeds 2.5m).
2. Installation Adaptation Costs
European older buildings require structural reinforcement reports (additional €1200/unit).
U.S. commercial projects mandate UL3703-compliant mounting systems.
3. Policy Fluctuation Costs
Brazil regulation: Residential systems require CPF registration for grid connection.
Vietnam market: Commercial projects must use local EPC contractors.
Supplier Screening Shortcuts
① Request real-time production capacity videos (verify genuine manufacturing facilities).
② Review logistics solutions (we offer: 3-day delivery from Germany warehouse / Middle East dedicated line with dustproof packaging).
③ Confirm policy agency services (including Brazil CPF registration / Vietnam EPC coordination and other value-added services).
As the global carbon neutrality drive accelerates, solar panel demand is becoming increasingly diversified and customized. As an integrated service provider with over a decade of expertise in international trade, we can deliver intelligent procurement solutions. Contact us if needed.